|
Tender Corrigendum :
|
| Tender Corrigendum | Deadline has been changes from Mar 4 2026 12:00AM to Mar 9 2026 12:00AM Date | | Tender Corrigendum Publication | Company Web Site - Internet | | Tender Corrigendum Document | Can be download by Subscribers | | Tender Corrigendum | Date | | Tender Corrigendum Publication | Company Web Site - Internet | | Tender Corrigendum Document | Can be download by Subscribers | | Tender Corrigendum | Date | | Tender Corrigendum Publication | Company Web Site - Internet | | Tender Corrigendum Document | Can be download by Subscribers |
|
|
Product Detail :
|
Tender Invited For Testing and Commissioning of copper bonded rod with low carbon steel high tensile strength copper bonded rod with min 254 microns of copper plating , Excavation of soil for making trench , Laying or fixing of HDPE Conduit or pipe Underground or surface complete as required as per site condition , Laying of 25MM PVC Pipe , Laying of 25MM PVC Flexible Pipe for Indoor complete as required , Laying of 25 or 32mm PVC Reinforceable flexible Pipe complete as required , Laying of Optical Fiber Cable end to end ferruling labeling and termination through GI Conduit or PVC Pipe complete as required , Laying of Cat6 UTP end to end ferruling labeling and termination through PVC Pipe complete as required , Laying of Electrical Cable end to end ferruling labeling and termination through GI Conduit or PVC Pipe complete as required , Mounting and Fixing of GI Pole after excavation of soft or hard soil including cutting of bituminous road or pavement , Mounting Fixing Labeling and Dressing of Floor Standing Rack complete as required , Mounting Fixing Labeling and Dressing of 6U Pole Mount Rack complete as required , Mounting Fixing and Labeling of All Types of Cameras complete as required , Installation Splicing of all OFC core Rack to Server Rack Labelling testing and commissioning , Installation of DB , Installation of 2 x 15- or 16- Amp Shuttered switch socket Combined with Cover Plate and back box For Surveillance Room End , Installation of Electrical Box with 25 Amp MCB 15 or 16 Amp Socket at Rack End , Installation Testing and Commissioning of 5KVA Online UPS with 60 Min Backup including UPS output Electrification complete as required , Installation Testing and Commissioning of NVR Primary and Redundancy complete as required , Termination and Fixing of Category 6 UTP Information Outlet , Mounting Fixing Installation and Configuration of All Types of Switches complete as required , Installation and Configuration of WorkStation complete as required , Installation and Configuration of Point to MultiPoint radio with accessories complete as required , Testing commissioning certification providing 3 sets of completion diagram and Documentation of Entire Project
Quantity 14787
|
| Tender Detail : |
2 Mega Pixel Network Outdoor I...
Quantity: 14787 |